What's Included

Approvals handled, transitions disappeared.

Rear extensions, second-storey additions, and laneway suites all move through the same discipline: permit drawings and municipal approvals handled in-house, structural coordination carried from foundation to roofline, and material transitions detailed so they disappear into the existing house rather than announcing themselves.

  • Rear, second-storey, and laneway additions
  • Permit drawings and municipal approvals handled in-house
  • Material transitions detailed to disappear, not announce
  • Structural coordination from foundation to roofline
How It Works

An addition, phase by phase.

Additions carry more risk before the shovel ever goes in the ground, so we front-load the feasibility and approvals work.

01
Phase One

Feasibility & Zoning

We check setbacks, height limits, and lot coverage against local zoning before any design work starts, so you know what's actually buildable before you fall in love with a concept.

  • Zoning, setback, and lot-coverage review
  • Preliminary structural feasibility with our engineering partners
  • A written scope and budget range within one week
An architect sketching an early addition floor plan with a ruler and pencil
02
Phase Two

Design, Engineer & Permit

Architectural drawings and structural engineering develop together, and we prepare and submit the permit package ourselves rather than handing that off to you to navigate.

  • Permit drawings and structural engineering, coordinated
  • Municipal submission and approvals managed in-house
  • Material and detailing plan for a seamless tie-in
Addition materials and elevation drawings laid out for review
03
Phase Three

Build

Foundation, framing, and envelope work proceed under continuous structural inspection, with particular care at every point where the new structure ties into the old, roofline, cladding, and interior finishes alike.

  • Foundation, framing, and building envelope
  • Structural coordination from footing to roofline
  • Weekly site walkthroughs through occupied-home construction
An addition mid-construction with framing exposed
04
Phase Four

Reveal

Final municipal inspections are closed out, the material transitions are checked in daylight and at night, and you're handed a care guide alongside a two-year workmanship warranty.

  • Final inspections closed out and punch list completed
  • Care guide for cladding, glazing, and finishes
  • Two-year workmanship warranty, direct line to your lead
Finished modern home addition with black cladding and glazing
Examples

A recent addition.

Read the Full Case Study
Currently booking Q4 2026

Thinking about an addition?